Builder Name:Philip Howe   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1711.75
Total Flight Time:6
Total Expense:N/A
Start/Last Date:Oct 19, 2020 - No Finish Date
Engine:Rotax 915is
Propeller:Whirlwind
Panel:Dynon
 
Friendly URL: https://eaabuilderslog.org?s=phowe

Home or Last Project Picture

Oct 03, 2023     Installing Prop Hub - (2 hours) Category: Propeller
We struggled to get the Whirlwind prop hub installed on the engine. We have been confused with the Whirlwind manual that Rans sent with the FWF kit. We then noticed it was for the 912 & 914. I then went on the Whirlwind site and downloaded the 915 manual.
Then we noticed that the bolts were about an inch too short with the spacer installed. I emailed Ran's tech support about this issue.
 